BSCM FY 2025 Projects

St. Thomas/ St. John

  1. Joseph Sibilly ES and Annex Septic Removal and Replacement
    • Remove and replace the existing Septic Tank at Sibilly ES, Main Campus.
    • Remove and replace the existing Septic Tank at Sibilly Annex
  2. Julius Sprauve Modular Drain Line Relocation.
    • Separate the existing modular buildings floor drains, from the sewer drain, and connect into a dedicated floor drain line to avoid sewer backups.
  3. Dober Complex Roof and Ceiling Repairs
    • Clean and recoat the existing roof coating.
  4. Edith Williams Alternative Education Academy Roof Repairs
    • Remove/ repair and or replace existing roof finishes to various campus roofs.
  5. Ivanna Eudora Kean Restroom Remodeling
    • Renovate existing cramped restroom stalls by reducing the number of stalls to allow for industry standard stall spacing.
  6. Flush Valve Removal and Replacement at District Schools
    • Remove and replace all flush valves prone to malfunction due to drops in water pressure.
  7. BCB Gymnasium Emergency Shelter and Restroom Renovations
    • Renovate the restrooms to ensure full functionality for school and Shelter activities.
    • Repair and or Replace all required interior room signage including lighted exit signage.
    • Renovate the access point to ensure wheelchair access to the Gymnasium floor, classrooms and restrooms.
  8. Environmental Repairs/ Replacements at District Modular facilities
    • Renovate all compromised roofs
    • Remove and replace inoperable packaged A/C units
    • Remove and replace all damaged ceiling vents, grids and ceiling tiles.
    • Remove and replace damaged interior walls, floor and finishes.

St. Croix District

  1. SCEC Track and field Lighting and Electrical Upgrade
    • Remove and replace all existing pole mounted track lighting with new LED track lighting.
    • Assess and repair the existing track lighting wiring, switches and breakers.
  2. School Food Authority Warehouse and Office Renovations
    • Renovate the existing warehouse office and restroom
    • Remove and replace the existing warehouse air conditioner.
    • Remove and replace the existing emergency generator.
  3. Pearl B. Larsen Roof Renovations
    • Clean and recoat the existing main campus roof.
    • Remove and replace the gymnasium roof.
    • Remove and replace the main campus gutters and downspouts
  4. Pearl B. Larsen Restroom Renovations
    • Renovate all restrooms identified by the district Maintenance Director.
  5. John H. Woodson Second Floor Walkway, Roof and Ceiling Renovations
    • Remove and replace the existing damaged roof sheathing, gutters and downspouts.
    • Remove and replace damaged ceiling grids and tiles.
    • Repair second floor concrete walkways and rails.
  6. John H. Woodson Restroom Renovations
    • Renovate all restrooms identified by the district Maintenance Director.
  7. District Pump Room and Equipment Renovations
    • Remove and replace all nonfunctional water pumps, pressure tanks valves and piping.
    • Install new filtration systems including UV filtration