BSCM FY 2025 Projects
St. Thomas/ St. John
- Joseph Sibilly ES and Annex Septic Removal and Replacement
- Remove and replace the existing Septic Tank at Sibilly ES, Main Campus.
- Remove and replace the existing Septic Tank at Sibilly Annex
- Julius Sprauve Modular Drain Line Relocation.
- Separate the existing modular buildings floor drains, from the sewer drain, and connect into a dedicated floor drain line to avoid sewer backups.
- Dober Complex Roof and Ceiling Repairs
- Clean and recoat the existing roof coating.
- Edith Williams Alternative Education Academy Roof Repairs
- Remove/ repair and or replace existing roof finishes to various campus roofs.
- Ivanna Eudora Kean Restroom Remodeling
- Renovate existing cramped restroom stalls by reducing the number of stalls to allow for industry standard stall spacing.
- Flush Valve Removal and Replacement at District Schools
- Remove and replace all flush valves prone to malfunction due to drops in water pressure.
- BCB Gymnasium Emergency Shelter and Restroom Renovations
- Renovate the restrooms to ensure full functionality for school and Shelter activities.
- Repair and or Replace all required interior room signage including lighted exit signage.
- Renovate the access point to ensure wheelchair access to the Gymnasium floor, classrooms and restrooms.
- Environmental Repairs/ Replacements at District Modular facilities
- Renovate all compromised roofs
- Remove and replace inoperable packaged A/C units
- Remove and replace all damaged ceiling vents, grids and ceiling tiles.
- Remove and replace damaged interior walls, floor and finishes.
St. Croix District
- SCEC Track and field Lighting and Electrical Upgrade
- Remove and replace all existing pole mounted track lighting with new LED track lighting.
- Assess and repair the existing track lighting wiring, switches and breakers.
- School Food Authority Warehouse and Office Renovations
- Renovate the existing warehouse office and restroom
- Remove and replace the existing warehouse air conditioner.
- Remove and replace the existing emergency generator.
- Pearl B. Larsen Roof Renovations
- Clean and recoat the existing main campus roof.
- Remove and replace the gymnasium roof.
- Remove and replace the main campus gutters and downspouts
- Pearl B. Larsen Restroom Renovations
- Renovate all restrooms identified by the district Maintenance Director.
- John H. Woodson Second Floor Walkway, Roof and Ceiling Renovations
- Remove and replace the existing damaged roof sheathing, gutters and downspouts.
- Remove and replace damaged ceiling grids and tiles.
- Repair second floor concrete walkways and rails.
- John H. Woodson Restroom Renovations
- Renovate all restrooms identified by the district Maintenance Director.
- District Pump Room and Equipment Renovations
- Remove and replace all nonfunctional water pumps, pressure tanks valves and piping.
- Install new filtration systems including UV filtration